Seoul · Since 2019

Mining Hardware Built for the Graveyard Shift

We assess, procure, and commission ASIC miners rated at 0.05 PH/s and above — machines engineered to run without rest in South Korean facilities.

Rows of ASIC mining rigs operating in a climate-controlled facility

What We Handle on Your Mining Floor

From the first watt estimate to the final hash rate reading, our team covers the physical work that keeps rigs earning around the clock.

Miner Deployment & Commissioning

Miner Deployment & Commissioning

Full procurement and rack installation for fleets starting at 0.05 PH/s, including power distribution review and thermal mapping.

Flagship service · Quote-based

Learn more →

Facility Hash Rate Assessment

Facility Hash Rate Assessment

On-site audit of existing hardware, cooling capacity, and uptime logs to identify bottlenecks before you scale.

Half-day visit · From ₩850,000

Learn more →

24/7 Maintenance Retainer

24/7 Maintenance Retainer

Scheduled fan replacements, firmware checks, and emergency callouts for operators who cannot afford unplanned downtime.

Monthly retainer · Per-rack pricing

Learn more →

Why Operators Trust Our Bench Tests

Every machine we recommend has spent at least 72 hours on our test rack before we sign off on a deployment plan.

Hash Rate Verified, Not Advertised

Manufacturer spec sheets list ideal conditions. We measure actual output at your expected ambient temperature and report the variance in writing.

Power Draw Measured at the PDU

Efficiency ratings matter when you pay industrial electricity rates in Gyeonggi-do. We log wattage per unit under sustained load, not at boot.

Noise and Heat Mapped

A 0.3 PH/s rack in a converted warehouse needs different ducting than one in a purpose-built container. We account for both.

Voices from the Floor

“They flagged that our intake fans were undersized before we ordered twelve more S19 units. Saved us a summer of thermal throttling, though I wish the assessment report had arrived a day sooner.”
— Min-jun Park, Gyeonggi Province hosting facility, 0.18 PH/s fleet
“The deployment crew wired our PDUs cleanly and left cable labels that actually match the rack diagram. Our night shift engineer can trace a fault in minutes now.”
— Soo-yeon Han, Incheon colocation, 0.42 PH/s expansion
“Honest about which models were overpriced for our power contract. We ended up with fewer units but better joules per terahash.”
— David Okonkwo, Seoul metro, 0.09 PH/s home operation

Read more client accounts →

Ready to Plan Your Mining Floor?

Tell us your target hash rate, power budget, and facility constraints. We respond within two business days with an equipment shortlist.

Send an Inquiry