Our fees reflect the physical labour, travel, and liability involved in deploying and maintaining industrial mining hardware. All prices are in Korean won and informational — final quotes depend on fleet size, location, and scope.
Service Rates
| Service | Basis | Starting Price |
|---|---|---|
| Miner Deployment & Commissioning | Per project, quote-based | ₩4,200,000 |
| Facility Hash Rate Assessment | Half-day on-site visit | ₩850,000 |
| 24/7 Maintenance Retainer | Per rack, per month | ₩180,000 |
| Emergency Callout (non-retainer) | Per hour, travel included within Seoul metro | ₩95,000 |
| Procurement Advisory Only | Per hardware shortlist | ₩650,000 |
Deployment Estimate Factors
Deployment quotes vary based on:
- Fleet size — Economies of scale apply above 0.2 PH/s; smaller fleets under 0.08 PH/s carry higher per-unit labour costs.
- Location — Sites beyond Gyeonggi-do incur travel and accommodation charges.
- Electrical readiness — If PDUs and circuits are not pre-installed, we coordinate with your electrician but do not perform licensed electrical work.
- Hardware source — Units purchased through our distributor network include logistics coordination; client-supplied hardware requires an intake inspection fee of ₩120,000.
Assessment Add-Ons
- Extended thermal mapping (full facility): +₩350,000
- Noise level survey for residential-adjacent sites: +₩200,000
- Hash board failure rate analysis (30-day log review): +₩280,000
Retainer Terms
Maintenance retainers require a minimum six-month commitment. Payment is due on the first of each month. Rack count is locked at contract signing; additions mid-term are pro-rated.
What Is Not Included in Any Quote
- ASIC hardware purchase price
- Electricity costs
- Pool fees or mining software subscriptions
- Building permits, fire safety inspections, or insurance
Request a Quote
Pricing depends on your specific facility and hash rate target. Contact us with your requirements and we will provide a written estimate within two business days.
All rates current as of August 2026. We review pricing annually based on labour costs and travel expenses.